Prioritizing watershed management practices in the Ferizi and Rig-Sefid watersheds using Fuzzy-TOPSIS Method

Document Type : Research/Original/Regular Article

Authors

1 Associate Professor/ Department of Natural Resources, Faculty of Natural Resources & Environment, University of Birjand, Birjand, Iran

2 Ph.D. Graduated Student/ Department of Natural Resources, Faculty of Desert Studies, University of Semnan, Semnan, Iran

3 Assistant Professor/ Department of Mathematics, Faculty of Mathematics and Statistics, University of Birjand, Birjand, Iran

Abstract

Introduction
Watershed management projects with different objectives require some kinds of prioritization due to the natural condition prevailing in the watershed, including socio-economic issues, technical and financial constraints. The main purpose of the paper is to provide and apply the concept and techniques of multi-criteria decision-making (MCDM) under a fuzzy environment in the prioritization and selection of projects in portfolio management. In order to priority watershed management practices and evaluate the ecological potential of Ferizi and Rig-Sefid watersheds (Chenaran city, Khorasan Razavi province), the Fuzzy-TOPSIS method has been used as a powerful tool in multi-criteria decision making.
Materials and Methods
In this study, the preference weights of the criteria were identified using fuzzy AHP. Then, the weights are embraced in fuzzy-TOPSIS to improve the gaps of projects (alternatives) to achieve the organizational objectives as well as interactions between projects. The hybrid Fuzzy-AHP and Fuzzy TOPSIS methods made it more systematic and helpful for the decision maker to choose the best alternative from watershed management practices. In this respect, there are three phases performed in this study, the first phase of data is collected via questionnaire by experts. Next, determining criteria weights via Fuzzy-AHP was the main purpose of the second phase. In the third phase, the output obtained from Fuzzy-AHP with regard to criteria weights is used as input to be applied in fuzzy-TOPSIS for defining the optimal alternative and capturing the complex relationships between the assessment criteria and alternatives.
Results and Discussion
The comparison of the prioritization with the Fuzzy-TOPSIS method in this study and studies in 2010 indicate their similarity to some items, while in the second category priorities, the differences are more than the third and fourth priorities. The results indicate that multi-criteria decision models suggest the best location due to the usage of several criteria quantitatively and qualitatively with respect to objectives. In addition, it can be provided valuable information on prioritizing executive operations for integrated watershed management. It is also revealed that in the Fuzzy-TOPSIS technique, calculating the weights of criteria is essential and they can adjust the rating for other projects. Therefore, Fuzzy-TOPSIS will additionally help to select the optimal management project for the decision-making process.
Conclusion
It was found that many researchers applied many kinds of MCDM methods to help the decision makers understand and have more concentration on the high rank of criteria and also provide the ranking of the best alternatives in different problems and situations.

Keywords

Main Subjects


Alizadeh, A. (2015). The principles of applied hydrology. 40th Edition: Imam Reza (AS) University, 942 pages (in Persian).
Amiri, M., Pourghasemi, H.R., Arabameri, A., Vazirzadeh, A., Yousefi, H., & Kafaei S. (2019). Prioritization of flood inundation of maharloo watershed in Iran using morphometric parameters analysis and TOPSIS MCDM model. Pp. 371-390, In: Spatial Modeling in GIS and R for Earth and Environmental Sciences, Elsevier.
Arabameri, A., Pourghasemi, H.R., & Cerda, A. (2018). Erodibility prioritization of sub-watersheds using morphometric parameters analysis and its mapping: A comparison among TOPSIS, VIKOR, SAW, and CF multi-criteria decision-making models. Science of The Total Environment, 613, 1385-1400.
Asadi Nalivan, O., Rezaei, F., & Saghazadeh, N. (2013). Assessment of watershed ecological power with taxonomy method for watershed comprehensive management (Case study: Zydasht Watershed, Taleghan). Environmental Erosion Research, 3(3), 15-26 (in Persian).
Auger, P., Charles, S., Viala, M., & Poggiale, J.C., (2000). Aggregation and emergence in ecological modeling: Integration of ecological levels. Ecological Modelling, 127, 11-20.
 Benedini, M. (1988). Developements and possibilities of optimization models. Agricultural Management, 13, 329-358.
Duckstein, L.S.O. (1980). Multiobjective optimization in river basin developement. Water Resources Research, 16, 14-20.
Ebrahimi, B., Memarian, H., & Tajbakhsh, S.M. (2016). Prioritization of watershed management practices to control environmental hazards in the watershed (Case study: Mukhtaran Birjand Plain watershed). 5th National Conference on Geomorphology and Environmental Challenges, Mashhad, Iran (in Persian).
Ghanavati, E., Karam, A., & Aghajani, M. (2012). Flood risk zonation in the Farahzad basin (Tehran) using AHP model. Journal of Geography, 9(31), 255-275.
Golkarian, A., Mohammadian, A., & Abdollahi, A. (2017). Prioritize the sub basins to watershed management activities (Case study: Watershed Daryan of Semnan province). Journal of Range and Watershed Managment, 70(3), 777-789 (in Persian).
Husam Jasim, M. (2021). The optimal project selection in portfolio management using fuzzy multi-criteria decision-making methodology. Journal of Sustainable Finance & Investment, 1–17.
Jun, K.S., Chung, E.S., Kim, Y.G., & Kim, Y. (2013). A fuzzy multi-criteria approach to flood risk vulnerability in South Korea by considering climate change impacts. Expert Systems with Applications, 40(4), 1003-13.
Levy, J.K. ( 2005). Multiple criteria decision making and decision support systems for flood risk management. Stochastic Environmental Research and Risk Assessment, 19(6), 438-47.
Malekian, A., Oftadegan Khuzani, A., Ashurnejad, G. (2012). Flood hazard zoning in watershed scale using fuzzy logic (Case study: Akhtar Abad Watershed). Physical Geography Research Quarterly, 44(4), 131-152 (in Persian).
Mesdaghi, M. (2015). Range management in Iran. 7th edition: Sajad Industrial University, 328 pages (in Persian).
Mosavi, S., Negahban, S., Rakhshaninasab, H., & Hossainzadeh, S. (2017). Assessment and zoning Flood risk by using Fuzzy logic TOPSIS in GIS (Case study: Baghmalek urban catchment). Journal of Natural Environmental Hazards, 5(10), 79-98 (in Persian).
Sinha, R., Bapalu, G.V., Singh, L.K., & Rath, B. (2008). Flood risk analysis in the Kosi river basin, north Bihar using multi-parametric approach of analytical hierarchy process (AHP). Journal of the Indian Society of Remote Sensing, 36(4), 335-349.
Stewart, T.L., & Scott, H. (1995). A scenario-based framework for multicriterion decision analysis in water resources planning. Water Resources Resesrch, 31, 2835-2843.
Tajbakhsh, S.M., Memarian, H., & Parsasadr, H. (2021). Evaluation of quantitative impact of watershed management projects on underground water level (Case study: Jamab Project). Journal of Rainwater Catchment Systems, 8(4), 51-62 (in Persian).
Vernes, J. (1984). Landslide hazard zoning; a review of principles and practice. The International Assosiation of Engeneering Geology Commision on Landslide and Other Mass Movement on Slope, France, United Nations, 63 pages.
Walczykiewicz, T. ( 2015). Multi-criteria analysis for selection of activity options limiting flood risk. Water Resources, 42(1), 124-132.
Witlox, F. (2005). Expert system in land-use planning: An overview. Expert systems with Applications, 29, 437-445.
Yeh, C.H., & Deng, H. (2004). A practical approach to fuzzy utilities comparison in fuzzy multi criteria analysis. International Journal of Approximate Reasoning, 35(2), 179-194.